Tembo Gold (TEM.V) has announced the assay results for hole TRC003 which is the first of a serie of planned close-spaced drill holes. They intercepted 23 meters at 4.7g/t that almost entirely consists of two higher-grade intervals of 4 meter at 5.28g/t and 1 meter at almost 78g/t.

The company thinks there are two mineralized zones in a 150 east-west corridor at Ngula 1, and it’s very likely the deep hole they reported three weeks ago in fact intersected this large structure in the northern part of this east-west corridor.

Tembo Gold will continue its close-spaced drill program as a first step towards a NI43-compliant resource estimate and to increase the confidence in the geological model.

> Read the press release

Disclosure: The author holds a long position in all stocks mentioned in this article. Please see our disclaimer for current positions.


Leave a comment