Allana Potash (AAA.TO) has announced an updated resource estimate on their Dallol potash project in Ethiopia. The Measured and Indicated resource estimate totals 2.45Bt at an average grade of 17.9 […]
Latest articles
African Gold Group announces updated resource estimate
African Gold Group (AGG.V) has announced an updated resource estimate for their Kobada project in Mali. The new resource estimate came in at 2.3Moz gold in the measured and indicated […]
Lupaka Gold announces results of the metallurgical testwork
Lupaka Gold (LPK.TO) has announced the results of the metallurgical testwork on their Crucero gold project in Peru. Leach times of 24 hours at a grind size of 80% passing […]
Lupaka Gold insider is buying shares
Darryl Jones, CFO of Lupaka Gold (LPK.TO) and former CFO of Corriente Resources (which got bought out for $680M in 2010) has bought 20,000 shares at an average price of […]
Q&A with Paul Kuhn, CEO of Avrupa Minerals
During our site visit in Portugal we sat down with Paul Kuhn, CEO of Avrupa Minerals (AVU.V), Blackheath Resources’ (BHR.V) Joint Venture partner on the Covas Tungsten project in the […]
B2Gold has restarted the production at Masbate
B2Gold (BTO.TO, NYSEMKT:BTG) announced the production has resumed at their Masbate gold mine in the Philippines as of last Saturday. The company halted the production approximately three weeks ago after […]
Lupaka Gold – Site Visit
After visiting Lupaka’s Peruvian operations, and based on the most recent ground magnetics survey, we are quite confident Crucero wil develop into the country’s next 5Moz+ deposit. [download_link link=”http://www.caesarsreport.com/freereports/CaesarsReport_2013-06-25.pdf” variation=”blue”] […]
Lupaka Gold – Site Visit Photos
The following pictures were taken at the site visit to Lupaka Gold’s projects spread across three regions of Peru. Please click the image or title to proceed to the photo […]