Tembo Gold Corp. (TEM.V) continues to release excellent news regarding its Tanzanian project. Drill hole TRC0423 intercepted 3 meters of 19.1 grammes per ton of gold at a depth of 39 meters, beneath artisanal mining. These widths and grades are very similar to the veins at the Bulyanhulu mine next door. The other intercepts at Mgusu weren’t as good as these 57 gram-meters, but mineralization was encountered and further drilling is warranted, as the Mgusu strike length is approximately 3.1 kilometers.

With these interesting intercepts, Tembo has now found mineralization in all three target areas, so the current 90.000 meter drill program has been very successful so far!

Disclosure: Tembo Gold Corp. is a sponsoring company. The author has also visited TemboGold’s project in Tanzania in February 2012, ad all of his costs have been reimbursed by the company. Please see our disclaimer for current positions.


Comments are closed.