Integra Resources (ITR.V, ITRG) has released the first set of drill results from the highwall geotechnical and metallurgical drill program it completed on the DeLamar project. The company completed almost 4,600 meters of drilling and has now released the results from the first 1,376 meters, drilled in ten holes designed to collect additional material for metallurgical and geotechnical testing.
As you can see in the table above, the grades are generally very consistent with what we can expect from DeLamar and Florida Mountain (after all, this is just met drilling and not exploration drilling) but some of the intervals are quite spectacular. Hole DLM-23-MET22 for instance had a very high-grade interval of 6.1 meters with an average grade of 23.2 g/t gold-equivalent (mainly fueled by the in excess of 1,600 g/t silver) which is a very impressive result.
According to CEO Kosec, the drill results confirm the strong continuity of the mineralization on the DeLamar project as the company continues the permitting process.
Disclosure: The author has a long position in Integra Resources. Integra is a sponsor of the website. Please read the disclaimer.