Simba Energy Inc. announced today they completed the First phase of field work on Block 2A in Kenya. During the seismic survey data from 218 listening stations was recovered and on top of that 675 geochemical samples were recovered. Final results and interpretations are expected within a few weeks.

James Dick, Simba’s CTO is happy with the results, stating that ‘This passive seismic survey has accelerated the exploration phase on Block 2A and has moved us closer to a drilling program.’.

You can read the entire press release here.

Disclosure: Simba Energy Inc. is a sponsoring company. Please see our disclaimer for current positions.


Comments are closed.