Integra Gold (ICG.V) has released the results of the updated Preliminary Economic Assessment, right in time for the BMO conference in Miami and the PDAC in Toronto. As expected, the […]
Tag: #Parallel
Integra Gold releases more thick and high-grade intersections at Triangle
Integra Gold (ICG.V) reported it has encountered a very thick and high grade zone from the C4 structure, where an infill drill program intersected 19 meters containing 19.81 g/t gold […]
Integra completes drilling at the No. 4 Plug zone – Upgrading our NPV expectations
Integra Gold (ICG.V) has released the final set of drill results from the No. 4 Plug zone, located just 500 meters from the Triangle Zone on the company’s Sigma Lamaque […]
Don’t underestimate the importance of Integra’s drill results at the No. 4 Plug
Integra Gold (ICG.V) has released more drill results from the No 4 Plug zone on its Lamaque gold project in Val D’Or, Québec. We were looking forward to see the […]
Integra Gold continues to push out exciting exploration results
Integra Gold (ICG.V) discovered more high-grade gold during its infill drill program on the C1 structure at the Lamaque project in Val D’Or, Québec. The existing mineralization was confirmed by […]
The infill drilling at Parallel continues to yield the expected results
Integra Gold (ICG.V) will very likely continue to entertain the market during the winter period as the company is obviously still drilling at its Lamaque project in Québec. The Parallel […]
Integra Gold has reported on nine additional drill holes at Parallel, confirming the continuity
Integra Gold (ICG.V) has once again released more drill results from the ongoing drill program at its Parallel zone of the Lamaque property. As a reminder, Parallel is located just […]
Integra’s drill program once again yields very exciting results
Integra Gold (ICG.V) has again released a fresh batch of drill results from its winter drill program at the Lamaque gold project in Val d’Or, Québec. Today’s results were from […]